GRANICA TRANSFORMACJI / GUBIN

Tunnel of Light
and Plants

SELECTED FOR IMPLEMENTATION / PARTICIPATORY BUDGET 2026

Light, greenery and reclaimed material. A proposal for a publicly accessible walk-through installation on the Theatre Island.

Project visualisation / illustration. Not a photograph of a completed installation.

Project visualisation / illustration. Not a photograph of a completed installation.

445

RESIDENTS’ VOTES

1.

PLACE IN THE RANKING

150 000 zł

PLANNED COST

01 / VOTING RESULTS

Residents chose the Tunnel.

The project ranked first and was selected for implementation in Gubin’s 2026 participatory budget. The official platform records 445 votes and a planned cost of PLN 150,000. This is the result of a residents’ vote, not an architecture competition jury award. Official results ↗

02 / CONCEPT

120 metres of light and greenery.

The proposal envisages a 120-metre tunnel on Gubin’s Theatre Island. Its modular structure would use steel production offcuts from the Ferro factory. Plans include controlled patination, LED lighting after dark with presence detection and wisteria planting. The installation is intended for walks, rest and meetings. Submitted project proposal ↗

Official register status: selected for implementation. This description reflects the proposal. It does not confirm completion or an opening date.

03 / SOURCES

Documentation and resources.

PARTICIPATORY BUDGET / RESULTS

Voting results · 2026 edition ↗

Sources checked on 11 September 2026.

RESONIKA / CONTACT

Let’s talk.

Questions about projects, the festival or working together? Get in touch.

Send a message

Main office:

ul. Piastowska 13
66-620 Gubin, Poland

Opening hours

MON–FRI 9:00-18:00

RESONIKA.ART

Choose what you allow

Optional services are off by default. You can change or withdraw your consent at any time.

Privacy policy